Development preparation / Snohomish County
Before the floor plan, understand the site.
Gather the records that can change where a project fits, what it needs and which questions must be answered first.
Prepared by Ask Anton · Sources checked November 10, 2026Start with the question that changes the decision.
Start with the legal lot and permitting jurisdiction, then assemble the property records and proposed scope. Work through dimensions, access, critical areas, utilities and drainage with the appropriate professionals. The county resources below concern unincorporated Snohomish County; a city may have a different process.
Build my checklistUse the legal lot and actual records.
The county’s site-plan guidance points applicants to recorded documents, assessor records, title reports and the applicable checklist. A tax parcel is not necessarily the same as a legal lot. Ask the permitting authority what evidence it needs for your proposal and have a surveyor resolve location or dimension questions.
Put access and physical features on the plan.
The residential checklist calls for legal-lot dimensions, adjacent right-of-way, private roads and easements, structures and distances to property lines. Gather the existing records before drawing a proposed footprint. Ask which current setbacks, access and fire-review requirements apply; do not infer them from a neighboring project.
Look beyond the parcel boundary.
The county explains that offsite critical areas can have buffers or setbacks affecting a proposal. More than one critical area may apply, and qualified reports or studies may be needed. Treat map layers as research leads and ask a qualified consultant what fieldwork and county review are required.
Reserve room for services and drainage.
The county checklist includes septic, wells, drainfields and reserve areas as well as disturbance, hard surfaces and runoff information. Ask the designer and service providers how the proposal fits around those features. Keep utility availability, connection scope and the stormwater approach as separate questions.
Build your document checklist.
Keep the question, the person who can answer it and your next step together. Use general notes; leave out names, addresses, account numbers and private documents.
Start with legal-lot status, access and obvious information gaps before relying on a proposed unit count.
0 of 6 items marked “Have record” by you. Having a document does not mean its contents are approved.
1. Legal lot and jurisdiction
Who to ask: Permitting authority, title company and surveyor as needed
Which legal lot and authority apply, and what records establish that?
2. Dimensions, structures and setbacks
Who to ask: Surveyor, designer and permitting authority
What is located accurately, and which current dimensional rules apply to this proposal?
3. Access, right-of-way and easements
Who to ask: Title company, surveyor, attorney and reviewing agencies
What rights and physical access exist, and what improvements or reviews may be needed?
4. Critical areas and required studies
Who to ask: Qualified consultant and permitting authority
Which onsite or offsite features may affect the proposal, and what fieldwork is needed?
5. Water, sewer or septic and power
Who to ask: Service providers, Health Department and designers
What is available, where does it fit, and what documentation and connection work are required?
6. Drainage, disturbance and hard surfaces
Who to ask: Civil designer and permitting authority
What is the preliminary stormwater approach, and which areas and costs remain unresolved?
Your worksheet entries clear on reset or reload. This tool does not submit documents, contact anyone, monitor deadlines or approve a transaction. Download your brief below to keep a copy.
Keep your next step simple.
Save your brief, or prepare a question for our digital assistant. Remove anything you do not want to share.
Ask in your own words.
Chat uses Functional cookies. Review to enable them.
You can download your brief if chat is unavailable. Email info@askanton.com.
You’re chatting with our digital assistant. Responses can make mistakes. Chat sessions are recorded. Verify important information before acting. About using Ask Anton
By sending a message, you agree to our Terms of Use, including arbitration and use of your submissions in content, and acknowledge our Privacy Policy.
Keep the assumptions and records together.
This checklist is not a survey, engineered site plan, buildable-envelope calculation or permit determination. Having a record does not mean its contents are current or sufficient. Confirm current project requirements with the permitting authority.
Sources checked November 10, 2026. Confirm current requirements for the actual property and transaction.