Property planning / Snohomish County

Before moving dirt, define the whole site-work proposal.

Bring the clearing limits, earthwork and drainage concept into one review before equipment arrives.

Prepared by Ask Anton · Sources checked November 10, 2026

Start with the decision and the missing evidence.

Describe all proposed clearing, excavation, fill, access and new or replaced hard surfaces. For unincorporated Snohomish County, ask PDS which land-disturbing and drainage requirements apply, and have the appropriate designer resolve runoff and site constraints. A grading estimate is not a permit determination.

Build my checklist

Count the whole disturbance.

County guidance evaluates the development project as a whole, including work for access, utilities and landscaping. Grading quantities and environmental impacts may also trigger review. Give PDS a complete scope instead of evaluating each task in isolation.

Source: Snohomish County: land disturbing activity and stormwater.

Ask which drainage requirements apply.

Drainage review depends on the proposed surfaces and disturbance as well as site conditions. Ask the designer to identify the receiving drainage path, relevant constraints and required documentation. The county updated its stormwater requirements on July 1, 2026; confirm which requirements govern this application.

Source: Snohomish County: land disturbing activity and stormwater.

Identify the responsible design professional.

The county engineering standards address transportation, drainage and utility facilities. Ask PDS and the designer which plans, calculations and inspections your proposal requires. Record the governing standards and any unresolved review comments so the contractor prices the same work that is being reviewed.

Source: Snohomish County: engineering design standards, effective July 1, 2026.

Make the contractor scope match the reviewed plan.

List erosion-control setup, earthwork, haul routes, disposal or imported material, drainage installation, restoration and inspections in the request for pricing. Ask who documents changes and who obtains approval before work departs from the plan. Keep unpriced tasks visible in the project budget.

Build your document checklist.

Keep the question, the person who can answer it and your next step together. Use general notes; leave out names, addresses, account numbers and private documents.

Map the complete disturbance and drainage questions before asking for a firm price.

0 of 6 items marked “Have record” by you. Having a document does not mean its contents are approved.

1. Complete disturbance and hard-surface scope

Who to ask: You, designer and contractor

What clearing, earthwork, access, utility and landscaping work is included?

2. Site conditions and existing records

Who to ask: Designer and relevant specialists

What evidence describes slopes, drainage paths, soils and protected areas?

3. Written permit and plan requirements

Who to ask: PDS and designer

Which applications, plans and current standards govern this proposal?

4. Runoff and downstream questions

Who to ask: Qualified drainage designer

Where will water go during and after construction, and what remains unresolved?

5. Comparable scope and exclusions

Who to ask: Contractor and designer

Which controls, haulage, restoration and inspections are priced or excluded?

6. Start conditions and changes

Who to ask: Permit holder, designer and contractor

What must happen before work, and who handles inspection requests and changed conditions?

Your worksheet entries clear on reset or reload. This tool does not submit documents, contact anyone, monitor deadlines or approve a transaction. Download your brief below to keep a copy.

Keep your next step simple.

Save your brief, or prepare a question for our digital assistant. Remove anything you do not want to share.

Your conversation

Ask in your own words.

Chat uses Functional cookies. Review to enable them.

You can download your brief if chat is unavailable. Email info@askanton.com.

You’re chatting with our digital assistant. Responses can make mistakes. Chat sessions are recorded. Verify important information before acting. About using Ask Anton
By sending a message, you agree to our Terms of Use, including arbitration and use of your submissions in content, and acknowledge our Privacy Policy.

What this worksheet can and cannot establish

This organizer does not calculate permit exemptions, design drainage or certify slope stability. Do not use a small work area, an informal estimate or a prior permit as proof that the complete proposed work is authorized.

Sources checked November 10, 2026. Confirm current requirements for the actual jurisdiction, property and transaction. The worksheet does not submit documents, monitor deadlines or contact professionals.